Premier Inn Winchester
Hampshire
Groundworks Value
0
+ VAT
Significant Materials
- 2500m2 powerfloated concrete floors and mesh reinforcement.
- 1139m3 of pit excavation to suit 96m3 GRP sewage retention tank and 222m3 surface water attenuation cells, along with rainwater harvesting tank, foul pump chamber and hydrobrake flow control chamber.
- 600m of below ground drainage and services.
- 1009m3 of premixed concrete.
- 4140tns of imported aggregates.
- 2315m3 cartaway off site.
New Hotel complex. Reinforced concrete pads and groundbeams, reinforced concrete lift pit and electrical sub-station. Extensive under building car park area and service yard, with associated drainage, attenuation tank, sewage retention and rainwater harvesting tanks, by-pass separator tank and below ground services, hard landscaping.