Holiday Inn Hotel, Gunwharf Quays
Portsmouth, Hampshire
Groundworks Value
+ VAT
Significant Materials
- 9000 tonnes of imported aggregates
- 9000m3 cartaway off site
- 1600m3 premixed concrete
- 200tns cut and bent reinforcement
Comprising of a large prestige hotel complex. Reduce dig working in liaison with ordnance bomb decommissioning team. Disposal of contaminated material. Piling attendance, pile preparation, reinforcement, pilecaps and groundbeam foundations, holding down bolts, reinforced concrete lift pits, 400m2 of retaining wall and underpass with associated suspended beam, column surrounds, formwork, extensive powerfloated floors 300mm thick reinforced with cut and bent steel. Car park areas with associated drainage and interceptors, below ground services, access road and connection with associated traffic management requirements, surface water channels, hard landscaping, block paving, slabs & kerbs. Detailed paving features of various high specification finishes.