Pompey Centre
Portsmouth, Hampshire
Groundworks Value
0
+ VAT
Significant Materials
- 3000m2 mesh reinforcement
- 120m of 1200mm concrete pipe (7 articulated lorry loads)
- 1410m3 of premixed concrete
- 5300tns of imported aggregates
- 275tns of precast paving slabs, paving blocks and kerbs
Comprising one very large industrial building, split into six substantially sized units. Reinforcement pads and groundbeams, reinforced concrete lift pits, formwork. Large car park area with associated drainage up to 1200mm diameter concrete pipework, below ground services, access road and connection with associated traffic management requirements, extensive hard landscaping, block paving car park bays, slabs & kerbs.